Solution

We divided the project into several phases:

  • Firstly, we provided AV consulting, discussing the audiovisual design of the various spaces.
  • Then, we made up a detailed project study leading to construction plans for the architects and contractors.
  • We executed the plans to reality in which we integrated the audiovisual infrastructure into the overall project with attention to detail.
  • Finally, we continuously monitor the installation and provide preventive maintenance.

    

Maintenance contract

Vestar opted for the most comprehensive maintenance contract. In this, BLUE MOON provides a 24/7 operated emergency number with a maximum on-site response time of 8 hours; preventive maintenance is carried out twice a year on all installations, the warranty on all equipment is extended to 4 years, and spare equipment is made available immediately in case of problems.